Key Takeaways
- Office furniture — workstations, benching, seating, storage and meeting tables — is exhibited in Phase 2, 23-27 October 2026, the same phase as furniture and building materials.
- Phase 1, 15-19 October 2026 covers advanced manufacturing: hardware, locking systems, lighting and electrical components that are built into office workstations and meeting rooms.
- The changeover windows (20-22 October and 28-30 October 2026) are the only practical slots in the fair calendar for a factory visit in Guangdong.
- Ask every supplier for a document set — test reports, material and emission certificates, packing specification and shop drawings — rather than a printed catalogue.
- Compare quotations per module, not by total price: a 1,400 × 700 mm workstation and a 1,600 × 800 mm bench are different line items with different structural requirements.
- Hongye Furniture Group has manufactured project furniture since 1996 from a 300,000+ sqm own factory in Heshan, Jiangmen, Guangdong, with 1,000+ skilled workers and a typical project lead time of 30-45 days from approved samples.
- We confirm our participation in the 140th Canton Fair, but a booth location is not published publicly: leave your contact details, product scope and departure country, and our team replies one-to-one with the visit invitation.
The 140th Canton Fair splits the office furniture offer across two phases, and buyers who plan for only one of them normally leave Guangzhou with an incomplete shortlist. Workstations, benching, seating and storage are exhibited in Phase 2, 23-27 October 2026. The hinges, locks, lighting, actuators and electrical components that sit inside those same products are exhibited a week earlier in Phase 1, 15-19 October 2026. This guide explains what to source in each phase, what to request from suppliers at the booth, and how to turn booth notes into an enquiry package that a procurement team can actually compare.

The Canton Fair — formally the China Import and Export Fair — is a twice-yearly trade exhibition held at the Canton Fair Complex in Pazhou, Guangzhou. The autumn 2026 edition is the 140th and runs for three phases between 15 October and 4 November 2026. For an office furniture buyer it is one of the few places where a complete project scope can be sourced in a single trip: desk frames, panel systems, task seating, filing and storage, meeting tables and the hardware that goes into them are all exhibited within walking distance of each other.
The practical complication is that these categories are not shown at the same time. Exhibition phases are organised by product sector rather than by project type, so an office fit-out spans Phase 1 and Phase 2. A buyer who arrives only for Phase 2 will specify a workstation and then discover that the monitor arm, the cable tray and the lock were never compared side by side. A buyer who arrives only for Phase 1 will come home with component prices but no finished furniture to specify.
The attendance scale is the other reason to plan properly. The 139th edition recorded around 188,000 overseas buyers from 227 countries and regions, and the exhibition area at the Pazhou complex exceeds 1.5 million sqm across the three phases (China Foreign Trade Centre (https://www.cantonfair.org.cn/), 2026). Walking two phases without a written sourcing plan is the most common way to waste the trip.
Office furniture is in Phase 2, which runs from 23 to 27 October 2026 and covers the quality-home category: furniture, building materials and home decoration. Everything a fit-out schedule calls "furniture" is in this phase, including:

- Workstation and benching systems, desk frames and height-adjustable tables
- Task, meeting and visitor seating
- Filing cabinets, lockers, tambour units and personal storage
- Meeting and conference tables, boardroom furniture
- Reception and collaboration furniture
If you only have five days available, Phase 2 is the phase that cannot be skipped for an office project.
Phase | Dates 2026 | Product scope | What an office buyer should take from it |
Phase 1 | 15-19 October | Advanced manufacturing: electronics and appliances, hardware, lighting, electrical | Locks, hinges, actuators, LED task lighting, cable management, power modules, sit-stand drive units |
Changeover | 20-22 October | No exhibition | Factory visit slot in Guangdong |
Phase 2 | 23-27 October | Quality home: furniture, building materials, home decoration | Workstations, benching, seating, storage, meeting tables, full fit-out scope |
Changeover | 28-30 October | No exhibition | Second factory visit slot |
Phase 3 | 31 October - 4 November | Medical and health, textiles | Only relevant if the office project includes a clinic or wellness room |
Three reasons, and each has a cost attached if it is ignored.

Components drive warranty claims. The lock on a locker, the hinge on a tambour unit and the gas lift or drive unit on a height-adjustable desk fail before the panel does. Sourcing them in Phase 1 lets you compare the component supplier directly instead of accepting whatever the furniture assembler happens to buy in.
Electrical integration is a Phase 1 question. Cable trays, under-desk power modules, USB charging points and monitor arm mounting plates have to be specified before the desk is ordered — not after the furniture arrives on site. Phase 1 is where those power and lighting interfaces are shown as catalogue products with ratings and certificates attached.
Lighting affects how the furniture looks. Linear task lighting and the LED driver that powers it belong to the same specification package as the desk. Buying them in the same trip avoids the situation where the lighting temperature and the finish of the workstation disagree.
What to source | Phase | Why it belongs there |
Desk frames, worktops, bench legs | Phase 2 | Finished furniture categories |
Filing, lockers, storage doors | Phase 2 | Finished furniture categories |
Locks, hinges, drawer slides | Phase 1 | Hardware stream |
Sit-stand drive units and control boxes | Phase 1 | Electrical and mechanical components |
Under-desk power, USB modules, cable trays | Phase 1 | Electrical accessories |
LED task lighting, drivers | Phase 1 | Lighting stream |
Acoustic panels and screens | Phase 2 | Furnishing category |
Monitor arms, CPU holders | Phase 1 | Hardware and mounting accessories |
A catalogue image and a unit price are not a supplier assessment. At the booth, request the document set below and note the response time. A supplier who cannot produce test evidence on the spot but promises to email it is still a supplier — but the promise becomes a gate you can check before the deposit stage.

Document | What it proves | Why ask at the booth |
Test report to the relevant standard | Structural and stability performance | Confirms the model you saw was actually tested |
Emission or indoor-air certificate | Low-emission board and finish | Needed for green building submissions |
Wood or forest-chain certificate | Sourced material claim | Supports responsible sourcing policy |
Shop drawing or technical data sheet | Dimensions, tolerances, interface points | Replaces a verbal description of the build |
Packing specification | Carton size, protection, stacking | Drives freight cost before the quote arrives |
Warranty statement with claim process | What happens after delivery | Distinguishes a policy from a promise |
Certification to a quality or environmental system | Factory-level process control | Separates the trading office from the factory |
For office tables, the European office-work-table standards — EN 527-1 (dimensions), EN 527-2 (strength and stability of the structure) and EN 527-3 (stability of the unit under load) — are the reference framework most often quoted by international specifiers (CEN (https://www.cen.eu/)), alongside the ANSI/BIFMA X5 series for desks and seating (BIFMA (https://www.bifma.org/)). Ask which standard each model was tested to, and ask for the report number. The answer tells you more about the supplier than the finish samples on the counter.
The fair is dark on 20-22 October and 28-30 October 2026. Those two windows are the reason a Guangdong factory visit fits naturally into a Canton Fair trip: the exhibition halls are closed, the suppliers are back at their plants, and a full day on the production floor is available without missing exhibition days.

A workable sequence for a buyer who wants both phases and a factory visit:
1. 15-19 October (Phase 1) — components, power and lighting. Collect part numbers and certificates.
2. 20-22 October (changeover) — factory visit. Look at panel processing, edge banding, assembly and packing, and at how the component parts from Phase 1 are actually integrated.
3. 23-27 October (Phase 2) — finished furniture. Confirm the workstation, seating and storage scope against the specification you drafted in Phase 1.
4. 28-30 October (changeover) — second factory visit or a technical clarification session on drawings.
5. After 30 October — issue the enquiry package while the details are fresh.
If a shorter trip is unavoidable, Phase 2 plus one changeover day is the minimum useful combination for a furniture-led project.
Quotations are only comparable when they describe the same module. Ask each supplier to quote on the same schedule of workstations, and check that the following fields are present in every line:

Field | Why it changes the price |
Worktop size and thickness | 1,200 × 600 mm, 1,400 × 700 mm and 1,600 × 800 mm are different boards and different frames |
Frame type and adjustment | Fixed, manually adjustable or electrically height-adjustable |
Cable management scope | Tray only, tray plus spine, or full vertical riser |
Screen or panel type and height | Fabric, acoustic, glass or melamine at each height band |
Storage per workstation | Pedestal, mobile unit, locker — each is a separate line |
Finish schedule | Melamine, HPL, veneer or laminate, and the matching edge band |
Packing and loading | Flat-packed or assembled, and how the modules are protected |
A quotation that lists one blended price per workstation cannot show which supplier is cheaper on storage and more expensive on frames. Splitting the schedule into components is the single change that most improves comparison quality — and it also makes the change-order conversation easier once the project is running.
Q: Which Canton Fair phase has office furniture?
A: Office furniture is exhibited in Phase 2, 23-27 October 2026, in the quality-home category alongside building materials and home decoration. Workstations, benching systems, task seating, filing and storage, and meeting tables are all shown in this phase.
Q: When is the Canton Fair 2026?
A: The 140th Canton Fair runs from 15 October to 4 November 2026 at the Canton Fair Complex in Pazhou, Guangzhou, in three phases: 15-19 October, 23-27 October and 31 October - 4 November, with changeover windows on 20-22 October and 28-30 October.
Q: Why should office furniture buyers visit Phase 1 as well?
A: Phase 1 covers advanced manufacturing — hardware, locks, hinges, lighting and electrical components. These are the parts that sit inside a workstation or a storage unit and that drive most warranty claims, so comparing them directly is more useful than accepting whatever the furniture assembler selected.
Q: What documents should an office furniture supplier provide at the fair?
A: Ask for the test report to the relevant standard, an emission or indoor-air certificate, the wood or forest-chain certificate if a material claim is made, a shop drawing or technical data sheet, the packing specification, and the warranty statement with its claim process. Also ask which quality or environmental system the factory itself is certified to.
Q: Can a factory visit be arranged during the fair?
A: Yes. The changeover windows of 20-22 October and 28-30 October 2026 are the natural slots, because the exhibition halls are closed and production teams are at the plant. Allow one full day, and ask for the production flow — panel processing, edge banding, assembly, inspection and packing — rather than a showroom tour alone.
Q: How do I compare office furniture quotations from different suppliers?
A: Break the schedule into modules using identical fields: worktop size and thickness, frame type and adjustment, cable management scope, screen type and height, storage per workstation, finish schedule, and packing method. A single blended price per workstation hides which supplier is competitive on which component.
Q: What is the typical lead time for a project office furniture order?
A: At Hongye Furniture Group the typical project lead time is 30-45 days from approved samples, with a documented inspection and export-packing record before shipment. Exact dates depend on the approved drawing set, the finish schedule and the order quantity, and are confirmed per project.